Monday, September 12, 2011

Triple degree heat.

Our response to the July heat:


Helping paint the bathroom shelves





The dog was highly distrustful of little girls with a hose.  He preferred the shade under the picnic table.





During

To get to the pipes that needed to be replaced, out came the floor, tub, tile, sink, and toilet.  

What a rotten joist looks like.


  Knocking out part of the other wall wasn't necessary, but might as well if everything else was coming up.  



Before

The last days of our peach 70 year old bathroom.





Labels: